Within the scope of the ITM439T 154 kV Dazkırı Completion Project, we are undertaking works as part of the TEİAŞ 7th Regional Directorate 154 kV Dazkırı Substation Construction Project.
As part of the Kyanly CCPP Project in Turkmenistan, RTU and SCADA training sessions were successfully conducted for Türkmenergo engineers at Kesir facilities.
Within the scope of the Navoi Project, Factory Acceptance Tests (FAT) for 220 kV and 500 kV Marshalling Kiosk Panels have been successfully completed.
Within the scope of the Kıyanlı Project, Factory Acceptance Tests (FAT) for 500 kV, 220 kV and 110 kV piano panels have been successfully completed.
The Göktepe RES Substation Project has been successfully completed on a turnkey basis, covering all stages from civil works and installation processes to testing, commissioning, and SCADA operations.