UEDAŞ Upper Structure Adaptation Performanceswithin the scope of CLK , Integrated Informatic Systems28.05.2018
Upper Structure Adaptation Performances at 288 Distribution Station in Bursa, Balıkesir, Çanakkale and Yalova engaged to UEDAŞ within in the scope Integrated Informatic Systems Projects which organized by CLK Partnership and commisioning Performances was successfully completed.
-Relay Installations and Commisioning fittingly present relay disassembly and telecommunication structure.
-RTU Installation and Commisioning Performances
-Router Commisioning Performances
-Constitution of HMI Pages at SCADA Side
-Point to point Test Performancesof related signals between Distribution Station and SCADA