TPP-CCPP Commissioning

Thermal and Natural Gas Combined Cycle power plants constitute the largest percentage of energy production in our country.

Failure to intervene at the time of failure at the TPP-CCPP facilities may affect the entire load flow and disturb the load balance of the interconnection system and cause the entire system to collapse.

The acceptance of the TPP-CCPP plants, which affect the continuity of the entire system, is carried out completely by the expert staffs.

Some of the testing and commissioning services provided at TPP-CCPP facilities;

  • TPP-CCPP HV Switchgear Test
  • TPP-CCPP MV-LV Switchgear test
  • TPP_CCPP DC-UPS Tests
  • TPP-CCPP Transformer Tests
  • TPP-CCPP Generator Tests
  • TPP-CCPP Bus Duct Tests
  • TPP-CCPP Ministry acceptance, grounding and relay tests,